FRP Profile Sewage Tank Cover Plate ah hian a awm a.
video
FRP Profile Sewage Tank Cover Plate ah hian a awm a.

FRP Profile Sewage Tank Cover Plate ah hian a awm a.

FRP Profile Sewage Tank Cover Plate 1. Construction Technology Foundation groove laih chhuah leh foundation leveling, leh paving mortar concrete cushion brick masonry (0){2}m sang) sand cushion-frp septic tank lifting, tank siamthatna siamthat,.
Inquiry thawn rawh .
Hrilhfiahna

 

FRP Profile Sewage Tank Cover Plate ah hian a awm a.

 

product-733-730

 

1. In sak dan tur technology .

A sakna tur chu foundation groove lai laih chhuah leh foundation leveling a ni a, paving mortar concrete cushion brick masonry (0){{1}m sang) sand cushion-frp septic tank lifting, tank siamthatna siamthat, balance tank-a tui injection siam that (0){{4}M Tui volume lian tak, tank-a fill filling level-a fill- Binding template installation concrete pouring enfiahna Well Masonry Top Backfill Layer Tamping Ground hmanga enkawlna

2. Hnathawh dan tur .

Pit lei laihchhuahna .

Septic tank model ang chuan foundation pit chu tehin an dah a, excavation process-a elevation chu an teh a, an control bawk a, chu chuan over-digging leh underdigging a veng thei a ni. Model size, lei quality leh lei thickness design slope coefficient ang chuan, excavator chu foundation pit design depth-a a laih chhuah chuan, groove hnuai lama lei layer 100~200mm thick tak a nih chuan, foundation pit hnuai lama lei hmasa ber chu tihchhiat loh nan leh foundation pit hnuai lam bearing capacity a nghawng loh nan.

2. Enkawlna bulpui .

Foundation pit tihfai hnuah foundation chu rammed a ni ang a, design drawing leh requirements angin leivut a awm ang. A chhan chu ash soil thickness chu 300mm a nih avangin, manual compaction emaw small tonnage roller emaw hmangin layered rolling atan;

Leivut lei an dah zawh chuan foundation cushion chu an la chhuak ang. Foundation lofting chuan a positioning leh dimensional accuracy, a bik takin longitudinal direction-ah, septic tank sir lehlamah 100~200mm aia tam emaw, a tlukpui emaw a nih theih nan, pool body chu bearing foundation cushion range chhungah a awm theih nan leh septic tank hnuai lama bearing zawng zawng stability a awm theih nan a enfiah tur a ni. Foundation cushion chuan 200mm thick C25 plain coagulation construction a hman hnuah leh a chakna inmil a thlen hnuah, 200mm thick medium sanding a siam a, a corner leh lung te chu sand-ah a phal lo.

Septic tank dahna tur a ni.

Hoisting a awm lai hian a chhehvel boruak kan ngaihven a ngai a, patrol turin special personnel kan buatsaih a ngai bawk. Chutih rual chuan, installation process chhung hian septic tank inlet leh outlet direction (site hawnna tih loh chu) ngaihven a ngai a ni. Septic tank i lift hmain i binding dawnin, tank system-ah rope pahnih hrual la, chutiang chuan a hun taka leh septic tank chu a chawi hnua boruak a nghing chu stabilize theih a ni ang a, a chhehvela building te nen inhnaih loh tur a ni a, thil siam zawh tawh leh hlohna dangte pawh a tichhia thei bawk. Product chu a hmuna an dah hnuah levelness chu a ruat tur a ni. Uniform a nih loh chuan level a thlen hma chu siamrem rawh.

4. Masonry-a Masonry-a Masonry .

c Foundation pit hnuai lam atanga bang dahna tur chu concrete cushion-ah siam tur a ni. Masonry hmain foundation dimension leh elevation te chu enfiah tur a ni a, wall masonry kil te chu teh tur a ni a, chhuah tur a ni. Masonry hmain brick-ah tui a hnim a, tui awm zat chu 10%~15% a ni a, mortar mix ratio chu laboratory-in a teh a ni. Onry chu a hung tur a ni: line chu midpoint-ah dah hmasa la, vertical line chu midpoint-ah hmang fo la, a sir tin size chu steel ruler hmangin enfiah la, a hlat zawng chuan a mamawh a tlin leh tlin loh enfiah bawk ang che. Bangte chu vertical a nih leh nih loh leh a sir lam chu square a nih leh nih loh enfiah rawh.

Wall Masonry hian a hnuaia condition te hi a zawm ngei tur a ni:

(1) Brick-te chakna grade chuan design mamawh a tlin a ngai a;

(2) Mortar strength grade chuan design mamawh a tlin a ngai a;

(3) Brick masonry corner leh junction chu a rualin siam tur a ni a, inclined tea chu temporary gap-ah siam tur a ni. Inclined tea-a horizontal projection length chu a tlem tur a ni lo .

2 / 3 a san zawng;

(4) Mortar pum pui chu 80% aia tam a ni tur a ni;

(5) Axis displacement chu 10mm aia tam a ni tur a ni lo;

(6) Verticality inthlak danglamna chu 10mm aia tlem a ni tur a ni;

(7) Horizontal ash seam thickness chu 8 ah control tur a ni.

 

 

 

 